3-4. füzet - Nagy László: Gátszakadás a Bárna-patakon

584 Nagy László dam, the bottom outlet structure and of the emergency spillway. The dam and the reservoir had been put into operation before all structures were completed and thus a dam-breach was only a question of time. Summarising it can be stated that the material of the dam was not suitable for the purpose, the design of the cross-section and of other structures was bad and there were construction faults. The dam-breach was an actuality to happen in any minute. The committee has also agreed that the dam-breech could have only been avoided if the reservoir was emptied before the flooding. There was such a resolution released but has not been implemented.