glctítritp UPDATE ON THE FUTURE SITE OF THE BETHLEN HOME All storm and sewage lines are completed in front of The Be­thlen Home and have crossed the road up the hill towards the new facility. The only line still needing to be run from in front of the current building is the water line. That will be done when weather permits. Work has begun on the new site. Pond B is complete and Pond A is nearly complete. These are the structures that control all runoff water. Roads have been cut in from both Kalassay Drive and Carey School Road allowing access from both sides. Some topsoil has been removed from the site to be used to cover previously exposed areas so they could be seeded. Very soon the major earth moving will begin. This will create the pad level for the new building. Pictured are scenes from the current work sites.