Hidrológiai Közlöny 1956 (36. évfolyam)

2. szám - Varhotov T. L.: Előregyártott elemek alkalmazása vízerőművek építésénél

Varhotov T. L.: Előregyártott elemek alkalmazása vízerőműveknél Hidrológiai Közlöny 36. évf. 2. sz. ,9,9 XOA CTpoiiTe/ibHbix paőOT no coopywemiio LLIIIJIB­CKOIÍ rimpo3JiCKTpocTaHmm ÄEMOHCXPIIPYETCH Ha <J>OTO 3, a no coopywemno KpacnoapcKOií T3C — Ha (J>OTO 5. B BblUieOniICaHHblX KOHCTpyKUIIHX I1JIOTIIH HOBOrO Tiina npiiMGHHGTCíi 3aTBop riiapaBJiimecKoro ÄCHCTBI I H, N3ROTOBJIENHBIII II3 cőopHoro WEJIE30ÖET0HA. MAHEBPN­poBamie 3aTBopoM HOBOÍÍ KOHCrpyKmni MOHÍHO JierKO riOHHTb no npiiBeAenHOMy pncynKy (puc. 13). RIPEAJIOWEHHA« HOBAN HHENCTAA KOHCTPYNMIH II3 cöopHoro »(E^E306ET0HA ao HACROHMERO BPCMCHII npu­MenflJiacb jiNINb ripii CTpoiiTeubCTBe Heőojibunix niapo­SJieKTpocTaHLiiiH (MomHOCTbK) MeHce 5 Meem). B Hac­Toamee BpeMH pa3paőaTbtBai0TCH npoei<Tbi Gojiee i<pyn­nbix riiApos^eKTpocTamiií MoiUHOCTbio OT 5 ao 20 Maem. TaKOÍÍ HBJIH6TCH, HaiipilMep, KOHCTaHTÜHOBCKaa IIIAPO­3JieKTpocTaHuiifl MomHOCTbro 19 Miem ((JJOTO 6, puc. 14, 15 ii 16). fljlH HOBblX npoeKTOB IipilMCHfUOTCH HCCKOJlbKO OTJiimaioiuiiecH or ripeflwayiunx cßopHbie >Kene306eT0H­nbie ŐJIOKII. >Kejie306eT0HHbie AOCKII coiJieHíuoTcn NYTEM cBapKii BbiCTynaiomiix KOHUOB apMaTypw (puc. 17). BbíMKII CTpOHTCH 113 IIHblX ŐJ10K0B (PHC. 18). K TO­pii30HTajibH0ií apMaTvpe ŐJIOKOB npiiBapiiBaeTCH Bepni­KajibHan apMaTypa, a nocneaHHH npiiBapiiBaeTCH K npeaBapiiTejibHO BAENAHHOII B Tejio njiOTimbi apMaType. npoeKTiipoBaHHoe iicnojiHemie CTpuirrejibCTBa KOH­CTaHTIIHOBCKOH I"HAp03.neKTp0CTaHmiII aeMOHCTpnpyeTCH Ha 4>°TO 6. BJIOKH uejiec006pa3H0 n3i'0T0BJi«Tb Ha nomiroHe. CeteHiie n nnan noJiiiroHa aeMOHCTpnpyiOTCH na puc. 21 ii 22. rimpoa^eKTpocTaHmiii, coopywae.wbie no npeaJio­HCENHOMY aBTopoM METOAY, HBJIHIOTCH SKOHOMimecKii BbirOAHblMII, T3K KaK IIX CTOIIMOCTb ripiiiviepHO Ha 15—20% HH>Ke CTOIIMOCTII IIiapOCTaHUIlií OÖbllHOH MOHOJIIITHOÍÍ KOHCTpy KUHII. ymiTblBafl TO OŐCTOHTejlbCTBO, HTO B COBCTCKOM CO­i03e B TeMeHiie SJHIHOHIUHX 10— 15.neT npeflycMaTpiiBaeT­Cfl CTpOHTejTbCTBO OKOJIO 700 riIApOSJieKTpOCTaHUIIH MOm­HOCTbio OT 500 äo 20 000 nem, npeajioweHHoe pemeHiie iiMeeT oqeHb őojibwoe SKOHOMimecKoe 3HaneHiie. The Use of Precast Elements in Hydraulic Structures By T. L. Varhotov , adapted to Hungarian by G. Karddi In contrast to dwelling and industrial buildings, the use of precast elements in hydraulic engineering has hitherto been restricted to a narrow field of application, namely to the construction of smaller irrigation struc­tures. Main reasons of this are the following : 1. Site conditions under which hydraulic struc­tures are constructed, are as a rule much more difficult, than those encountered with domestic and industrial constructions. 2. Hydraulic structures must be inherently rigid and impermeable, the prefabrication methods hitherto commonly used are therefore unsuitable in hydraulic engineering. 3. Adequate methods are lacking as yet. The first efforts towards a more economic design of hyd­raulic structures were aimed at the reduction of con­crete volume. For this end the length of the foundation slab was increased in the direction of flow, locating the gate structure at the same time farther downstreams (Fig. 1). The hydraulic load acting on the upstream extension results in an increased factor of safety against sliding, without requiring an excess of concrete volume. The same motive led to the development of the Senkow-system (Fig. 2.) which, by using a boxlike ribbed structure made additional savings in concrete volume possible. The Senkow-system, in a form improved by the Giproselelektro Institute is shown by Fig. 3. The length of the foundation slab is reduced by 25 per cent, and the shore pier is similarily of the box-like, ribbed design. The trend towards more economic design is exemplified by the structure shown in Fig. 4. The elimination of intermediate piers and the use of a simple gate structure reduced construction costs appre­ciably. Fig. 5. illustrates the design adopted for the Shilsk power plant. The weir, power plant, shore pier, and supporting walls are constructed of precast elements joined subsequently to monolithic units (Plan of the plant is shown by Fig. 8). Different alternatives are compared in the accompanying table. (Picture 1. gives a view of the power plant.) The box-like design adopted for the weir (see Fig. 6.) results in an almost uniform soil pressure-distribution (Fig. 7.). The shore pier, also of a box-like design, is similar­ly advantageous as regards stability (see Fig. 9.). Com­pared to structures in common use, construction costs thereof are materially lower (Fig. 10.). Difficulties are encountered in the oonstruction of underwater parts of power stations using precast ele­ments, especially if a head-increaser is also being built, like in the Shilsk power plant (Fig. I 1.). The precast, reinforced concrete dements used are of a very simple design. Each element consists of two slabs 0,5 m wide, 7 cm thick and of a length varying from 3 to 4 metres, each pair being connected by a rein­forced concrete diaphragm. Free ends of reinforcing bars are connected by welding upon installation of individual elements (Pic­ture 2.). Joints thus formed are caulked with cement­mortar and the space between the slabs is filled with concrete (Fig. 12.), ensuring thereby the monolithic action of the structure. Boxes are filled with sand or gravel. The construction of the Shilsk and Krasnoyarsk power plants is shown in Pictures 3 and 5 respectively. Tainter gates of a new design and shown by Fig. 13. will be used for the projected power plants. The ope­ration of the gates can easily be understood from the figure. The suggested box-like structure has been used up to date for smaller power plants only, with capacities under 5 MW. Designs for plants with capacities ranging from 5 to 20 MW are being prepared. The Konstan­tinowsk power plant with an output of 19 MW is one of these (Picture 6, Figs. 14, 15, and 16.). The design of precast elements to be used will slightly be modified. Slabs will be joined by welding free ends of reinforcing bars together (Fig. 17.). Different elements will be used for the construction of intermediate piers (Fig. 18.). Vertical bars welded to the horizontal reinforcement of precast elements, are to be joined with those embedded previously in the dam body. The construction method to be employed for the Konstantinowsk power plant is shown by Picture 6. Precast elements are preferably poured in a plant erected on site. Section and plan of the precasting plant are shown by Figs. 21 and 22 respectively. Power plants constructed by the method suggested by the author, using precast elements of box-like design are economical, the construction cost involved being from 15 to 20 per cent lower, than that of plants of conventional, monolithic design. The method suggested is of great economic signi­ficance, bearing in mind that the erection of about 700 power plants with capacities ranging from 500 to 20,000 kW, has been provisioned within the next 10—15 years in the Soviet Union.

Next

/
Oldalképek
Tartalom