Hidrológiai Közlöny, 2017 (97. évfolyam)

2017 / 3. szám - MANAGING ENVIRONMENTAL RISKS - FLOOD PROTECTION EXPERIENCES AND COOPERATION IN THE DANUBE RIVER BASIN - Piriîanu, Marisandra - Neamţu, Silvia - Constantin, Gheorghe: EAST AVERT Project MIS ETC 966 implementation - Good Practice Example of Crossborder Cooperation for Flood Risk Prevention

70 Hidrológiai Közlöny (Hungarian Journal of Hydrology) 2017. 97. évf. 3. sz.- Training 20 specialists in the processing and communication of primary data and in designing dispatch and cartographical applications- Processing and communicating data- designing the trilateral informational system for water and emergency situations management- Modernising the hydrological information and forecasting system 3. Preparing the Flood Directive (2007/60/EC) reporting to the Preliminary Flood Risk Assessment and Flood Flazard and Risk Mapping along the Prut floodplain and in the Siret basin, upstream Romania Partners from Ukraine and Republic of Moldova have applied unitary methods, assisted by Romanian experts (who already reported to EC according to the Flood Directive), in order to carry out the mapping of historical floods for the river basins. Also, they de­livered the historical flood analysis and cartographic products for the territory of the Siret and Prut basins in the two countries. Based on these results, the men­tioned partners will produce the necessary reports for the Flood Directive and will assist the Ministry of Environment (LP (PP1)) in preparing the integrated report for the cross-border area to the EC. 4. Collaboration for improving the framework of bilat­eral agreements in case of floods 5. Transparency 6. Management and coordination Figure 5. Improving the functional capacity of Integrated Monitoring & Early Warning Systems: equipment for 9 hydro­meteorological data collection centres, 3 regional computational centres and 1 national forecasting centre for forecasts, 11 admin­istrative dissemination centres INFO BOX Number of partners: 8 partners Project Budget: 9,243,784.56 € Project Duration: 29 November 2013-31 December 2017 Project Lead Partner: Ministry of Environment, Romania Project Manager: Mrs. Marisanda PTrfianu Contact Details: marisanda.piriianu@mmediu.ro Funded by: Joint Operational Programme Romania-Ukraine-Republic of Moldova 2007-2013 Official website of the project: http://eastavert.mmediu.ro (available in the near future) LINK WITH THE EUSDR ACTIONS, EXPECTED PROJECT RESULTS The results to be achieved by the EAST AVERT MIS ETC 966 project are the following: • Developing a modem, integrated monitoring and warning system to protect communities living in the border areas of the Prut and Siret river basins; • Long-term development of the integrated approach to prevent and protect communities against floods, by a strategic land development plan, utilising the flood hazard and vulnerability/risk maps; • Elaboration of the “River Basin Protection Plan against ice-floods, hydrological drought, accidents occurring at the hydro-technical constructions” through the cooperation of the responsible stakeholders in the territory of Romania, Ukraine and Republic of Moldova; • Improving the management of floods, accidental pollutions in the river basin and the quality of the

Next

/
Thumbnails
Contents